Local Navigation Warning

Port of Mallacoota

Location: Mallacoota inlet to the sea

DATE:  17 July 2020

DETAILS:  Mariners are advised that the East Gippsland Catchment Management Authority (EGCMA) has authorised Parks Victoria to undertake an artificial opening of the Mallacoota Inlet entrance to the sea.

Parks Victoria and EGCMA are currently arranging the logistics and environmental approvals required to undertake the opening operation.

Parks Victoria is planning the opening to occur on or around Tuesday 21st July 2020 with operations to commence on Monday 20th July 2020.

Parks Victoria staff will be on site to manage all on ground and on water safety operations. The entrance will be opened using excavation machinery to remove sand and allow water to flow from the Inlet to the sea.

Waterway and land exclusion zones will be in force near the proposed entrance prior to the commencement of works and the eventual opening. Maritime Safety Victoria is responsible for creating the Waterway exclusion zone. The exclusion zone will remain in force from Monday 20th July 2020 to Tuesday 28th July 2020.

Further information can be obtained by contacting Sean Philipson (EGCMA) on mobile phone 0408 829 672 or Daryl Burns (Parks Victoria) on mobile phone 0408 368 164.

Download File: Download
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Subscribe

Subscribe to receive regular email updates

Name:

Email:

Select Port:

Select Posts:
 Post
 Page
 Attachment
 Wccpf
 Wccaf
 Wccvf
 Wcccf
 Acf-taxonomy
 Acf-post-type
 Acf-field-group
 Acf-field
 Product
 Product Variation
 Shop Order
 Shop Order Refund
 Shop Order Placehold
 Wpcf7 Contact Form
 Mariners Notice
 Tenders
 Boating Guides
 Jobs
 Reports
 Plans
 Bathymetric Surveys
 Current And Planned
 News
 Dlm Download
 Dlm Download Version
 Exactmetrics Note
 Mkhb Header
 Mkhb Revision