DATE:  05 March 2018

DETAILS:  Mariners are advised that East Gippsland Shire will continue excavation and maintenance dredging operations at Bastion Point Boat Ramp intermittently and for an indefinite period.

The excavation dredging includes the mobilisation of excavation plant and the Cutter Suction Dredge and equipment to the boat ramp site and lower car park. Dredging pipework will extend from the excavation site to the spoil discharge ground on the western intertidal zone.

Mariners are advised that during dredging operations, interruptions to vessel launching and retrieval may occur from time to time due to the necessary closure of boat ramp access lanes.

East Gippsland Shire shall monitor the dredging progress and open a single boat ramp lane when access is reinstated to accommodate vessel launching and retrieval while dredging operations take place.

Barricades shall be installed and Ramp Closed and Safety Signage will be erected at the boat ramp works site and car parking areas should the Shire decide to close an access lane. 

General Navigation Advice

Mariners are reminded that depths in the approach channel to the boat ramp remain compromised by sand build up which heightens the safety risk of navigating through the approach channel especially at low water.

Passage through the approach channel should only be attempted by experienced vessel operators who possess sound knowledge of the conditions to be expected during the transit of the channel taking into consideration the prevailing weather and sea conditions at the time.

Transits of the approach channel should only be carried out if there is sufficient height of tide taking into consideration the vessels draft, the current sea state, the predicted weather for the duration of the voyage and the expected conditions at the channel entrance for the time of return.Mariners are advised that least depths in the vicinity of the boat ramp and approach channel are unknown and can change at short notice. Vessel operators are advised to acquire an enhanced awareness of changed conditions and adjust their operating plans accordingly.

Extra precaution should be taken when operating to or from the facility and vessel operators should be aware of other traffic in the area.Passengers should be briefed and have an awareness of the heightened risks that may prevail at the time of departure or arrival.

Operations to or from the facility should be avoided during the hours of darkness.

 IF IN DOUBT DON’T GO OUT

Download File: Download
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Subscribe

Subscribe to receive regular email updates

Name:

Email:

Select Port:

Select Posts:
 Post
 Page
 Attachment
 Wccpf
 Wccaf
 Wccvf
 Wcccf
 Acf-taxonomy
 Acf-post-type
 Acf-field-group
 Acf-field
 Product
 Product Variation
 Shop Order
 Shop Order Refund
 Shop Order Placehold
 Wpcf7 Contact Form
 Mariners Notice
 Tenders
 Boating Guides
 Jobs
 Reports
 Plans
 Bathymetric Surveys
 Current And Planned
 News
 Dlm Download
 Dlm Download Version
 Exactmetrics Note
 Mkhb Header
 Mkhb Revision