Info & Reports
Home About Us Contact Us Feedback

Home
Facilities
Local Navigation
C'ttee of M'ment
Info & Reports
Fees & Charges
Financials
Educational
Notice to Mariners
Strategy Plan
Tide Tables
Tenders
Links
Employment

Gippland Ports Logo
Service Providers

Home

 

bulletAnnual Report 2006 - 2007 New
bullet Position Statement - McLoughlins Beach Jetty
bullet(Preliminary) Replacement Options for CSD Sandpiper
bulletHuman Resource Management Ver 5.0   (367 Kb. Acrobat Reader needed)
bulletPort Welshpool Shipping Pier, Position Statement
bulletPort Albert - Stockyard Point Redevelopement Position Statement Updated
bulletLong Term Management Plan Dredging Lakes Entrance
bulletSafety and Environmental Management Plans
bulletMiddle Ground Study
bulletSand Management Study
bulletPaynesville and Lakes Entrance Berth Review

Reports of the Lakes Entrance Sand Management Program are available from that web site: www.lesmp.vic.gov.au
 

Safety and Environmental Management Plans
 

Report No.

Report Title

SEMPs for
South Gippsland

The Ports of Anderson Inlet, Port Albert and Corner Inlet Updated


2.47 Mb

SEMPs for
East Gippsland

The Ports of Gippsland Lakes, Snowy River and Mallacoota Updated


5.1 Mb

(Preliminary) Replacement Options for CSD Sandpiper

Report No.

Report Title

1

May 2005 - Lakes Entrance Report

  84 kb
2 Preliminary Report Index 12 kb
3 Chartlet 'A' Fixed GP Pipes and Risers 880 kb
4 Chartlet 'B' Lakes Entrance Dredging Areas 1,593 kb
5 Table  1A Production Details CSD Sandpiper 9 kb
6 Table 1B CSD Sandpiper Production rates 7 kb
7 Table 2 -  Cost of STLT Options Rev.1 13 kb
8 Table 3 - Cost of ST Options Rev.1 11 kb
9 Table 4 - Cost of LT Options Rev.1 12 kb
10 Table 5 - CsD prices RM RD 11 kb
11 Table 6 - Resume of all options 8 kb
12 Weekly Costs - GP Sandpiper working 38 H/W 7 kb
13 Weekly Costs - GP owned and operated Ellicott 670, 38 H/W 7 kb
14 Weekly Costs - GP owned and operated  Neumann 250 38 H/W 7 kb
15

Weekly Costs - GP owned and operated  Neumann 250 Used  38 H/W

7 kb
16 Weekly Costs - Contractor Beaver 600, working 40 H/W 8 kb
17 Weekly Costs - Contractor Beaver 1200, working  80 H/W 9 kb
18 Weekly Costs - Contractor Neumann 250 working 50 H/W 8 kb
19 Weekly Costs - Contractor Neumann 250 working 66 H/W 8 kb
20 Weekly Costs - Contractor Ellicott 670 working 66 H/W 8 kb
21 Weekly Costs - Contractor Ellicott 670 working 80 H/W 8 kb
22 Weekly Costs - Contractor Slurry Systems 38 H/W 8 kb
23 Sandpiper Replacement 736 kb

Port Welshpool Shipping Pier

Report No.

Report Title

 

Gippsland Ports Position Statement  Port Welshpool Shipping Pier


8 kb

Port Albert - Stockyard Point

Report No.

Report Title

 

Port Albert-Stockyard Point Redevelopment Gippsland Ports Position Updated


12 Mb

 

Long Term Management Plan for Dredging Lakes Entrance

Report No.

Report Title

LTMP Dredging LE

Long Term Management Plan Dredging Lakes Entrance
 - Version 1


3.73Mb

Middle Ground Study

Report No.

Report Title

Whole

Whole Report


13,921 Kb
Subsections

Alternatively, the following subsections can be downloaded separately

 
1

Gippsland Ports Position -
Executive Summary and Introduction


833 Kb

2 Technical Options


3,526 Kb

3 Environmental Values and Issues
1,852 Kb
4 Economic Assessment
80 Kb
5 Conclusion - Bibliography and References
44 Kb
6 - A Appendix A
284 Kb
6 - B Appendix B
10 Kb
6 - C Appendix C
5,565 Kb
6 - D Appendix D
1,667 Kb
6 - E Appendix E
122 Kb
6 - F Appendix F
16 Kb
6 - G Appendix G
37 Kb
6 - H Appendix H
39 Kb

Sand Management Study position paper and Reports

Report No. Report Title

0 Sand management study position paper
Gippsland Ports


22Kb

1 Study brief
Gippsland Ports

44Kb
2 Lakes Entrance Bar and Channel Dynamics
Coastal Engineering Solutions

1780Kb
3 Sand Management Study
Lawson & Treloar

831Kb
4 Removal or Reduction of the Bar
Evers Consult

2805Kb
5 Sand Management Study
Jesz Fleming

1728Kb
6 Sand Transfer System upgrade to sand bypass
Slurry Systems

194Kb
6a STS Upgrade to bypassing Drawing No. 1
554Kb
6b STS Upgrade to bypassing Drawing No. 2
596Kb
6c STS Upgrade to bypassing Drawing No. 3
549Kb
6d STS Upgrade to bypassing Drawing No. 4
669Kb
6e STS Upgrade to bypassing Drawing No. 5
661Kb
6f STS Upgrade to bypassing Drawing No. 6
678Kb
7 Sand bypass and channel maintenance dredging proposal (Commercial in confidence)
Slurry Systems Marine
 
8 Business case for sand management at Lakes Entrance - Economic and Social investment study report
Dr R R Noakes

3363Kb
9 Summary and recommendations
BJ Martin 

241Kb

Paynesville and Lakes Entrance Berth Review

Report No.

Report Title

Whole Whole Report
10400Kb
Subsections Alternatively, the following subsections can be downloaded separately  
1 Introduction
346Kb
2 Project Description
3750Kb
3 Paynesville Berth Review and Development Planning
4320Kb
4 Lakes Entrance Berth Review and Development Planning
2040Kb
5 Priorities and Costs
36Kb

 

Extensive use of thumbnails is used to speed up loading time. Click on any image to enlarge it, then click back on browser.


This site is copyright Lakes Internet Promotions © 2000 - 2007 All rights reserved. Disclaimer and Copyright Statement